Production

Take a Closer Look at Our Production Steps
Mold Step

MOLD

BRK Metal produces Molds of parts with customer design by offering the most economical and effective solutions to its customers in a very short time.

Sample Step

SAMPLE

Sample production having an important place in investment casting (lostwax) is realized in a short time like 2-3 weeks.

Mass manufacturing

Mass manufacturing

Parts whose sample is approved are continued to be produced in the same sensitivity when it is passed to mass manufacturing...

Following wax injection, wax trees remain at ceramic process for 10 days in ceramic housing. Ceramic trees whose drying is completed are separated from wax with autoclave. After the burning and sinter processes, casting is realized with analysis requested by customers. Parts are subjected to stress relieving process with thermal treatment after mechanical processes are performed such as cutting and runner cleaning.

Parts are ready for shipping as a result of quality control procedures made after the cleaning with sanding. In case of no extra requests such as processing, coating, hardening, delivery is performed between 4-6 weeks by the order amount.

Read More
Minimize
Processing

Processing

BRK Metal which can realize finishes part delivery makes external processing apart from the parts it processed in its own body. After the parts are processed, they are delivered together with measurement and analysis reports by demands of customer.

Other Processes

Other Processes

Other processes such as thermal treatment, coating, dyeing, assembly and special packaging are performed by external authorized and certified firms in line with customer demands and delivered to the customers.

Shipping

Shipping

Approval is taken from customers on packaging and shipping before the finisher parts are delivered. Products are shipped in Euro pallet, cases or packaged by contracted carrier of firms in compliance with European standards.